1A
|
Introduction
|
|
|
1A-1...................About This Manual
|
1B
|
General
|
|
|
1B-1..................Glossary and Abbreviations
|
|
|
1B-2...................Contact Information
|
|
|
1B-4...................Densities for Use in Estimating Quantities
|
|
1B-5...................Concrete Pipe Thickness Tables
|
|
|
1B-6...................Project Cost Estimates
|
|
|
1B-7...................Managing Changes in Project Concepts
|
1C
|
Standards and Design Criteria
|
|
|
1C-1...................Selecting Design Criteria
|
|
1C-7...................Public Interest Findings
|
|
1C-8...................Documenting Design Decisions
|
1D
|
Plan Development
|
|
|
1D-1...................Project Flow Chart
|
|
1D-3...................Preliminary Survey Procedure
|
|
1D-4...................Pavement Determination Process
|
|
1D-7...................Interchange Review
|
|
1D-8...................Access Review Submittal
|
|
1D-9...................Field Examination Checklist (New and Reconstructed Highways)
|
|
1D-10.................Field Examination Checklist (3R and 4R Projects)
|
|
1D-14.................Lighting Warrants Request
|
|
1D-15.................Design Public Meeting Displays
|
|
1D-20.................Reviewing Railroad Crossings at Side Roads
|
|
1D-21.................Flood Debris Removal Plans
|
1E
|
Plan Preparation
|
|
|
1E-1....................Certification of Plans
|
|
1E-3....................Plan Revisions
|
|
1E-4....................Road Design Details
|
|
1E-5....................Standard Road Plans
|
|
1E-6....................Designer Information for Standard Road Plans
|
|
1E-7....................Designer Information for Road Design Details
|
|
1E-8....................Plan Submittals for County Review
|
|
1E-9....................Standard Notes
|
1F
|
Plan Sheets
|
|
|
1F-1....................Plan Sheets – General Information
|
|
1F-2....................A Sheets
|
|
1F-2a..................Title Sheet
|
|
1F-2b..................Location Map Sheets
|
|
1F-2c..................Plan Revision Sheets
|
|
1F-3....................B Sheets
|
|
1F-3a..................Typical Cross Sections
|
|
1F-4....................C Sheets
|
|
1F-4a..................Project Description Tabulation
|
|
1F-4.5..................CS Sheets
|
|
1F-5....................D Sheets
|
|
1F-5a..................Plan and Profile Legend and Symbol Information Sheet
|
|
1F-5b..................Plan and Profile Sheets
|
|
1F-6.....................E Sheets
|
|
1F-7.....................F Sheets
|
|
1F-8.....................G Sheets
|
|
1F-9.....................H Sheets and HE Sheets
|
|
1F-10...................J Sheets
|
|
1F-11...................K Sheets
|
|
1F-12...................L Sheets
|
|
1F-12b...........Intersection Layout Sheets
|
|
1F-13...................M Sheets
|
|
1F-13.5..............MIT Sheets
|
|
1F-14...................N Sheets
|
|
1F-15...................P Sheets
|
|
1F-16...................Q Sheets
|
|
1F-16.1................QR Sheets
|
|
1F-17...................R Sheets
|
|
1F-18...................S Sheets
|
|
1F-19...................SPS Sheets
|
|
1F-20...................T Sheets
|
|
1F-21...................U Sheets
|
|
1F-22...................V Sheets
|
|
1F-23...................W, X, and Y Sheets
|
|
1F-23a............Cross Section Spacing and Sheet Dimensions
|
|
1F-24...................Z Sheets
|
1G
|
Bid Item Information
|
|
|
1G-1...................Bid Item Determination and Quantity Estimation
|
|
1G-4...................Bidding Mobilizations for Watering
|
|
1G-5...................Bidding Mobilizations for Erosion Control
|
|
1G-6...................Salvaged Materials
|
|
1G-7...................Monitoring with Incident Response
|
|
1G-8...................Items Left in Place between Projects
|
|
1G-10.................Bidding Alternate Items
|
|
1G-14.................Pavement Incentive/Disincentive Bid Items
|
1H
|
Final Plan Preparations
|
|
|
1H-1...................Plan Turn-In
|
|
1H-2...................Changes After Plan Turn-In
|
|
1H-3...................Communication with Contractors and Field Staff
|
3A
|
Roadways
|
|
|
3A-1...................Typical Roadway Sections
|
3C
|
Shoulders and Curbs
|
|
|
3C-2...................Curbs
|
|
3C-3...................Shoulder Cross Slope
|
|
3C-3.5................Shoulder Design Changes
|
|
3C-4...................Shoulder Design
|
|
3C-5...................Shoulder and Centerline Rumble Strips
|
|
3C-6...................Safety Edge
|
|
3C-10...................Earth Shoulder Construction and Earth Shoulder Finishing
|
3D
|
Subgrade and Subbase
|
|
|
3D-1...................Subgrade Slopes
|
|
3D-2...................Grading on Multi-Year Four Lane Divided Roadway Projects
|
|
3D-3...................Pavement Drainage and Strength Layers
|
3E
|
Medians
|
|
|
3E-1....................Medians
|
|
3E-2....................Median Crossings
|
|
3E-3....................Temporary Median Crossovers
|
3F
|
Foreslopes
|
|
|
3F-2....................Foreslopes at Drainage Structures
|
|
3F-3....................Transverse Slope Adjustment at Entrances and Safety Ramps
|
3G
|
Ditches
|
|
|
3G-1...................Roadway Ditches
|
|
3G-2...................Intercepting Ditches
|
3J
|
Berms and Benches
|
|
|
3J-1.....................Berms and Benches
|
3K
|
Access Points
|
|
|
3K-2...................Entrance Design
|
4A
|
Urban Drainage Design
|
|
|
4A-1...................Introduction to Stormwater Drainage System Design
|
|
4A-2...................Stormwater Drainage System Information Sources, Documentation, and Permitting
|
|
4A-3...................Effects of Roadway Geometrics On Pavement Drainage
|
|
4A-4...................Concept Plan
|
|
4A-5....................Using the Rational Method to Determine Peak Flow
|
|
4A-6...................Calculating Spread and Checking Intake Location
|
|
4A-7...................Open-throat Curb Intakes
|
|
4A-8...................Barrier Grate Intakes
|
|
4A-10.................Storm Sewer Design
|
|
4A-11.................Cost Estimates and City Agreements
|
|
4A-12.................Removing or Abandoning Storm or Sanitary Sewer
|
|
4A-13.................Removing Intakes or Manholes
|
|
4A-50.................Introduction to Geopak Drainage
|
|
4A-51.................Creating a Survey Report
|
|
4A-52.................Starting a GEOPAK Drainage Project
|
|
4A-53.................GEOPAK Drainage-Structures
|
|
4A-54.................GEOPAK Drainage Area
|
|
4A-55.................Geopak Drainage – Pipes
|
|
4A-56.................Geopak Drainage – Networks
|
|
4A-57.................Geopak Drainage – Pipe Profiles
|
|
4A-58.................Geopak Drainage – Drainage Reports
|
4B
|
Rural Drainage Design
|
|
|
4B-1...................Determining Entrance and Safety Ramp Pipe Culvert Lengths
|
|
4B-2...................Livestock Passes
|
|
4B-3...................Removing or Abandoning Culverts
|
4C
|
Miscellaneous
|
|
|
4C-1...................Subdrains
|
|
4C-2...................Bridge End Drains for Capturing Stormwater Runoff
|
6A
|
Geometric Design of Intersections
|
|
|
6A-1...................Horizontal Intersection Design: Rural Two-Lane
|
|
|
6A-2...................Intersection Design Vehicle
|
|
6A-3...................Modern Roundabouts-General Guidance
|
|
6A-3a.................Roundabout Feasibility Initial Screening Tool
|
|
6A-7...................Rumble Strips at Intersections
|
|
6A-8...................Intersection Alignment (Rural Primary Highways)
|
|
6A-9...................Edge Profiles
|
|
6A-10...................Intersection Edge of Traveled Way Design (Edge Returns)
|
|
6A-11...................Stop Sign Islands
|
6B
|
Geometric Design of Interchanges
|
|
|
6B-1...................Cross Sections of One and Two Lane Ramps and Loops
|
|
6B-2...................County Roads through Interchanges
|
|
6B-3...................County Roads over Primary Highways
|
|
6B-6...................Accesses and Safety Dikes at Ramp/Loop Terminals
|
6C
|
Geometric Design of Lanes
|
|
|
6C-1...................Adding, Dropping, or Redirecting Through Lanes
|
|
6C-2...................Super Two Highways
|
|
6C-5...................Four-Lane Expressway Turn Lanes
|
|
6C-6...................Continuous Two-Way Left-Turn Lanes (TWLTLs)
|
|
6C-8...................Parking on Urban Highways
|
6D
|
Sight Distance
|
|
|
6D-1...................Sight Distance
|
9A
|
Principles
|
|
|
9A-1...................Fundamental Principles of Traffic Control in Work Zones
|
|
9A-2...................Traffic Control Zones
|
|
9A-3...................Tapers
|
|
9A-4...................Regulatory Speed Limit Changes
|
|
9A-5...................Traffic Control Plans
|
9B
|
Traffic Control Devices
|
|
|
9B-1...................Basic Requirements of Traffic Control Devices
|
|
9B-2...................Signs
|
|
9B-3...................Channelizing Devices
|
|
9B-4...................Raised Pavement Markers and Delineators
|
|
9B-5...................Warning Lights
|
|
9B-6...................Floodlights
|
|
9B-7...................Arrow Displays
|
|
9B-8...................Changeable Message Signs
|
|
9B-9...................Temporary Barrier Rail
|
|
9B-10.................Road Closures
|
|
9B-11.................Speed Feedback Trailer Signs
|
9C
|
Work Zone Applications
|
|
|
9C-1...................Introduction to Work Zone Activities
|
|
9C-2...................Work Located Off the Traveled Way
|
|
9C-3...................Work on Two-Lane Roadways
|
|
9C-4...................Work on Multi-Lane Roadways
|
|
9C-5...................Control of Traffic through Incident Areas
|
|
9C-6...................On-Site Detours and Temporary Connections
|
|
9C-7...................Haul Road Crossings
|
9D
|
Pavement Markings
|
|
|
9D-1...................Pavement Markings
|
9E
|
Traffic Control
|
|
|
9E-1...................Traffic Critical Projects Program
|
20A
|
Starting a New Project - General
|
|
|
20A-1................Start New MicroStation Project
|
|
20A-2................Survey Request
|
|
20A-3................Plan Development CADD Standards
|
|
20A-20..............Attaching Reference Ties and Bench Marks
|
20B
|
Folders and Files
|
|
|
20B-1..................Design Seed File Listing
|
|
20B-41................Project Directory Folder Structure
|
|
20B-44................Project Directory Design Folder Structure
|
|
20B-45................File Naming CCRRRPPPGGG Notation
|
|
20B-51................Folder and Files, Photo and Survey
|
|
20B-71................Electronic Files Supplied by the Office of Design
|
|
20B-72................Engineering Content to Review in Digital Deliverables
|
|
20B-73................Methods for Reviewing Digital Deliverables Content
|
|
20B-75................Office of Location and Environment File Exchange
|
|
20B-81................Project Directory Letting Folder Structure
|
20D
|
GEOPAK Setup and General Information
|
|
|
20D-2.................GEOPAK® Element and File Naming Convention
|
|
20D-101.............OpenRoads Files and Naming Conventions
|
|
20D-102.............OpenRoads Element Naming Conventions
|
20F
|
Modeling & Geopak Cross-Sections
|
|
|
20F-21................Corridor Modeler - Bridge Berm
|
|
20F-30................Preparing for Earthwork
|
20H
|
Geopak 3D and Machine Control Grading
|
|
|
20H-10................Creating XML Machine Guidance Files
|
|
20H-20................Converting DGN to DXF
|
20J
|
Project Bid Items & Quantities (PSS)
|
|
|
20J-61................Calculation Files
|
|
20J-62................Earthwork Calculation Program
|
|
20J-71................Project Locator
|
|
20J-81................Accessing the Project Scheduling System
|
|
20J-82................Bid Item Information
|
|
20J-86................Alternate Bid Item Sheet Exporting
|
21A
|
D & C Manager Tools
|
|
|
21A-1.................CPN Data Instructions; Model, Data, and Attachment
|
|
21A-5.................InfoSnap – Quick Info
|
|
21A-6.................Open Explorer to Working Directory
|
|
21A-7.................Remove Empty Text Strings
|
|
21A-8.................Sink/Restore Dialogs
|
|
21A-11...............VBA Tool Box, Horizontal
|
|
21A-12...............VBA Tool Box, Vertical
|
|
21A-21...............Cell Clipper
|
|
21A-22...............Copy, Rotate, and Scale tool
|
|
21A-23...............Measure Horizontal Distance
|
|
21A-24...............Measure Slope Distance
|
|
21A-25...............Move Element(s) From Level to Level
|
|
21A-26...............Rotate (Active Elements)
|
|
21A-27...............Text, Change Size
|
|
21A-36...............Create Backup File on “C” Drive
|
|
21A-37...............Level Match
|
|
21A-38...............Turn Selected Levels On/Off
|
|
21A-39...............Ref-Map
|
|
21A-40...............Create New Models
|
|
21A-41...............Model Export and Import
|
|
21A-42...............Model Rename
|
|
21A-43...............Save Model to the Alt File
|
|
21A-44...............Model Search
|
|
21A-45...............Raster Replace Drive Letter with Server Name
|
|
21A-46...............Ref File Level Lock
|
|
21A-48...............Reference Display, On-Off
|
|
21A-49...............Reference List
|
|
21A-50...............Reference Attach
|
|
21A-51...............Reference Detach
|
|
21A-52...............Legend and Symbol Information Sheets
|
|
21A-53...............Text Labeler
|
|
21A-80...............Batch Print Shape Placement
|
|
21A-81...............Border Send to Back and Copy Print Border
|
|
21A-150.............Color Changer
|
|
21A-151.............Multi Scale Creator
|
|
21A-201.............COGO Alignments, Plan View
|
|
21A-202.............COGO Profiles, Alignments
|
|
21A-203.............COGO Profiles, Entrance
|
|
21A-204.............COGO Ditch Grade Placement Tool
|
|
21A-206.............InDGN Lines
|
|
21A-503.............Existing Utility Legend
|
|
21A-600.............Soils Borrow Quantity Text Box
|
|
21A-800.............The D&C Compute Mode
|
21B
|
Geopak
|
|
|
21B-2................Motif and Layout Builder programs for P&P Sheeting
|
|
21B-3.................P & P Sheet - DBG Guide Cells
|
|
21B-4.................P & P Geopak Sheeting Instruction
|
|
21B-5.................P & P Sheeting Library Development
|
|
21B-6.................P & P Port Shape Parameters
|
|
21B-7.................P & P Sheeting Port Names, Levels, Colors
|
|
21B-20...............Roadway Cross-Section Sheet Composition
|
|
21B-22...............Granular Blanket Cross-Section Line-Work
|
|
21B-23...............Drawing Utility Symbols with GEOPAK Ancillary Features
|
|
21B-58...............Geopak Tables
|
|
21B-65...............Geopak Project Manager
|
|
21B-68...............Superelevation – Automated
|
|
21B-155.............Typical Component Tool
|
|
21B-156.............Geopak TIN to XML Conversion
|
|
21B-157.............DTM Draw Surfaces
|
|
21B-158.............Surface Clipping
|
|
21B-159.............Creating Profiles from Survey Shots
|
|
21B-200.............Corridor Modeler
|
|
21B-224.............Corridor Modeler Templates and Components
|
|
21B-250.............Draw Cross Sections from Surfaces
|
|
21B-270.............Developing 3D Models for Design Projects
|
|
21B-280.............Corridor Modeler Labeler
|
|
21B-290.............Drive Roadway-Corridor Modeler
|
|
21B-300.............Draping Raster Images
|
21C
|
MicroStation
|
|
|
21C-33...............PDF Scroll, Creating & Plotting
|
|
21C-53...............Hyperlinks in Microstation
|
|
21C-54...............CopySeed Program
|
|
21C-55...............View Groups vs Models
|
|
21C-56...............Attach a Multipage PDF to a MicroStation File
|
|
21C-70............... Creating a KMZ File from MicroStation Line Work
|
|
21C-71............... Geographic Coordinate Systems in MicroStation
|
21E
|
Printing, Plan Turn-ins
|
|
|
21E-1................MicroStation Multipage PDF Printing
|
|
21E-4................Color Plan Procedures
|
21F
|
DOT ProjectWise System
|
|
|
21F-1................NonDOT User Access to Iowa DOT ProjectWise System
|
|
21F-10..............ProjectWise Basics
|
|
21F-21..............Exporting and Importing Documents from ProjectWise
|
|
21F-22..............ProjectWise Hyperlinks
|
|
21F-23..............ProjectWise Email Attachments
|
|
21F-24..............ProjectWise Replacing Documents
|
|
21F-25..............Reference Scanning CADD Files in ProjectWise
|
21M
|
Miscellaneous Topics
|
|
|
21M-1.................FTP Site Access
|
|
21M-11...............Creating Hyperlinks
|
|
21M-12...............Create File and Folder Listing
|
|
21M-39..............Work Schedule Instructions
|
|
21M-41..............Long Term Project E-mail Storage
|
|
21M-42..............How to Capture the Full Path to a File
|
|
21M-43..............File Extensions do not Display - Windows 7
|
|
21M-51..............Superelevation Transition Evaluation Tool
|
|
21M-61..............Post Letting Plans
|
|
21M-100............Digitally Signing Electronic Contract Documents
|
|
21M-101............Exporting a Digital Certificate
|
|
21M-102............Creating eFiles Listing for Special Provision Appendix
|
40B
|
Surface Topography Data Collection
|
|
|
40B-1.................Feature Codes – Full Descriptions
|
|
40B-2.................Feature Codes - Titles Only
|
|
40B-3.................Feature Codes - Categories
|
|
40B-4.................Feature Codes - Modifications
|
|
40B-5.................Full and Partial DTM Surveys
|
|
40B-7.................Bridge Data Collection
|
|
40B-8.................Culvert Data Collection
|
|
40B-9.................Storm Sewer Intakes and Manhole Data Collection
|
|
40B-10...............Feature Codes for Roadway Survey
|
|
40B-11...............Feature Codes for Entrance and Intersection Survey
|
|
40B-12...............Feature Codes for Curb & Gutter Survey
|
40D
|
MicroStation and GEOPAK Survey Mapping Process
|
|
40D-1.................Folder Structure and File Naming
|
|
40D-2................Survey Preferences
|
|
40D-3.................Loading Datasets
|
|
40D-4.................Editing Survey Data
|
|
40D-5.................Checking for Crossing Chains
|
|
40D-6.................Creating Horizontal Alignments
|
|
40D-7.................Processing Datasets in Models and Zones
|
|
40D-8.................Build DTM from Elements
|
|
40D-9.................Build DTM from Survey Data
|
|
40D-10...............Editing the DTM
|
|
40D-11...............Drawing Contours
|
|
40D-12...............Using Design and Computation (D&C) Manager
|
|
40D-13...............Drawing Horizontal Alignments
|
|
40D-14...............Station and Offset Reports
|
|
40D-15...............Completing the G Sheet
|
|
40D-16...............GEOPAK Survey TOPO Model Links
|
|
40D-17...............How to Use the Survey Information
|
200A
|
Overview of Geotechnical Design
|
|
|
200A-1...............Introduction
|
|
200A-2...............Project Coordination
|
|
200A-3...............Geotechnical Consultant Services and Review
|
200B
|
S Events
|
|
|
200B-1...............The S1 Event
|
|
200B-2...............The S2 Event
|
|
200B-3...............The S3 Event
|
|
200B-4...............The S4 Event
|
200C
|
Surface Investigation Methods
|
|
|
200C-1...............Subsurface Investigation Methods
|
200D
|
Laboratory Testing
|
|
|
200D-1...............Laboratory Testing
|
200E
|
Engineering Properties of Soil and Rock
|
|
|
200E-1...............Engineering Properties of Soil and Rock
|
200F
|
Analysis, Design, and Treatment
|
|
|
200F-1...............Slope Stability
|
|
200F-2...............Embankments
|
|
200F-3...............Mechanically Stabilized Earth (MSE) Wall Evaluations
|
|
200F-4...............Driven Pile Design
|
|
200F-5...............Drilled Shaft Design
|
|
200F-6...............Intermediate Foundation Improvements (IFIs)
|
|
200F-7...............Prefabricated Vertical Wick Drains (PVDs)
|
|
200F-8...............Rock Cut Slopes
|
|
200F-9...............Geosynthetic Design
|
|
200F-10.............Landslide Analysis and Mitigation
|
|
200F-11.............Soil Cut Slopes
|
200G
|
Construction Involvement
|
|
|
200G-1...............Construction Involvement
|
200H
|
Emergency Relief Projects
|
|
|
200H-1...............Emergency Relief Projects
|
200I
|
Appendix A – Consultant Geotechnical Work Requirements
|
|
200I-1...............Appendix A - Consultant Geotechnical (Soils Design) Work Requirements
|
Design Manual Video Index
|
|